Description
LVPS are monitored 24h. The ignore list shown here is created manually and supported by the ANL group.
To reduce the output, a module with V=0 volts is checked every 6h.
This description wiki describes the 2014 monitoring.
Status of oracle queries (for experts)
Data processing status is given in this link. It shows the data retrieved from the Oracle ATONR_ADG database used in this analysis. The sizes of the retrieved data should be above 1000 kB and there should be no gaps in dates.
Modules ignored
Nr |
module(s)/status |
start |
end |
comment |
Nr |
module(s)/status |
start |
end |
comment |
generated from the CSV source: web_list_ignored_www.csv
New modules
The table below is used to map new modules:
Module |
Start time |
End time |
Comment |
generated from the CSV source: web_list_new.csv
Refurbished modules
The table below is used to map refurbished modules:
Module |
Start time |
End time |
Comment |
generated from the CSV source: web_list_refurbished.csv