# LVPS trip messages from MRS DAQ LogManager. S.Chekanov (ANL) 01 Jun 2018 20:27:20 CEST LBA29 seems to be off (at least the ROD link is off), maybe it tripped before the start of run. 01 Jun 2018 20:27:20 CEST LBA30 seems to be off (at least the ROD link is off), maybe it tripped before the start of run. 02 Jun 2018 04:48:44 CEST Start reconfiguring drawer TileEBA47, RunNumber 351671, LBN 564 02 Jun 2018 04:48:52 CEST Drawer EBA47 is currently disabled. Power cycling is not possible now. 02 Jun 2018 04:49:35 CEST Drawer TileEBA47 reconfigured, RunNumber 351671, LBN 565 02 Jun 2018 04:49:53 CEST EBA47 is discarding 100% of events. It will be automatically reconfigured now. Please check the next MRS messages. 02 Jun 2018 04:49:59 CEST Start reconfiguring drawer TileEBA47, RunNumber 351671, LBN 566 02 Jun 2018 04:50:50 CEST Drawer TileEBA47 reconfigured, RunNumber 351671, LBN 568 02 Jun 2018 05:10:46 CEST EBA47 seems to be off (at least the ROD link is off). [Run #351671 LB #589] 02 Jun 2018 05:13:33 CEST Start reconfiguring drawer TileEBA47, RunNumber 351671, LBN 591 02 Jun 2018 05:13:52 CEST Drawer EBA47 is currently disabled. Power cycling is not possible now. 02 Jun 2018 05:14:19 CEST Drawer TileEBA47 reconfigured, RunNumber 351671, LBN 592