User Tools

Site Tools


itk:testbeam

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
itk:testbeam [2016/09/30 17:30]
asc
itk:testbeam [2016/09/30 18:05]
asc
Line 1: Line 1:
  
 ======  Pixel module test beam at SLAC ====== ======  Pixel module test beam at SLAC ======
-(prepared by S.Chekanov)+(some notes by S.Chekanov)
  
  
Line 30: Line 30:
  
 Here is the setup at the end-station A: Here is the setup at the end-station A:
 +
 +This is the  RTI module (uncovered):
  
 {{:itk:img_20160928_103349.jpg?400|Setup}} {{:itk:img_20160928_103349.jpg?400|Setup}}
 +
 +This is the  RTI module + RD53 prototype (uncovered):
  
 {{:itk:img_20160928_100735.jpg?400|Setup}} {{:itk:img_20160928_100735.jpg?400|Setup}}
Line 191: Line 195:
  
  
-Both modules from RTI have  shown signs of degradation performance. After about ~6-8h, we start to see problems for the analog  +Both modules from RTI have  shown signs of degradation in performance. After about ~6-8h, we start to see problems for the analog readout. The occupancy for analog channel efficiency for  uncalibrated module goes from 99% to 70% after 6h. The noise increases by a factor 2.   
-channels. The occupancy for uncalibrated module goes from 99% to 70% after 6h. The noise increases by a factor 2.  + 
 +This problem is not related to the active beam, since the red module was not under the beam on Sep 28. 
  
-This problem is not related to the active beam, since the red module was not under the beam in Sep 28.  
  
  
itk/testbeam.txt · Last modified: 2016/10/04 15:11 by asc