itk:testbeam_febmi2017 [2017/03/22 22:27]
dfrizzell [Current Status]
itk:testbeam_febmi2017 [2017/04/06 02:16]
dfrizzell [Current Status]
Line 4: Line 4:
 The main goal of this testbeam is to test HVCMOS pixel sensors. The University of Geneva  provides the telescope, DAQ  and technical expertise to set it up and use it. The main goal of this testbeam is to test HVCMOS pixel sensors. The University of Geneva  provides the telescope, DAQ  and technical expertise to set it up and use it.
  
-We will attempt to test  RTI module and integrate it with U.Geneva telescope. +<fc #FF0000>__**Read the {{:itk:fermilab_testbeam_manual_march2017.pdf| Testbeam Manual}} before and during your shift!**__</fc>
  
 A outline of the sample test schedule is here https://docs.google.com/spreadsheets/d/1Uv5hGlnCU5rnV7FzXFXE4O0cko_fOGiu8kYgUpBxdu8/edit#gid=876192247 A outline of the sample test schedule is here https://docs.google.com/spreadsheets/d/1Uv5hGlnCU5rnV7FzXFXE4O0cko_fOGiu8kYgUpBxdu8/edit#gid=876192247
  
-work in progress for operating the telescope can be found here:+living document for operating the telescope can be found here:
 https://docs.google.com/document/d/1c0UE1NvmkBhJ4uaZUzRNWKqHAOI5j43DbJwnIyXC7yM/edit https://docs.google.com/document/d/1c0UE1NvmkBhJ4uaZUzRNWKqHAOI5j43DbJwnIyXC7yM/edit
 ====== Current Status ====== ====== Current Status ======
-Trying to solve temperature issues.  +Updated Last: Apr 4  10:00pm
-===== Open Access  ===== +
- +
- +
- They plan to use different particle species and we may be a week without good beam, at least if we want to run during the day. They expect to be done as early as Friday. Monday will be roof repairs and there will not be beam for anywhere from 1/2-3 days ===== +
- +
  
 +Taking data. We have cooling system "working". Would still like to understand the humidity more. Some of the samples have been taking to irradiations.
 ====== Argonne Equipment at FTBF Inventory List ====== ====== Argonne Equipment at FTBF Inventory List ======
  
Line 28: Line 24:
   * Bertan 380N HV power supply in crate   * Bertan 380N HV power supply in crate
   * Chiller Plate + fittings and hose    * Chiller Plate + fittings and hose 
 +  * Single Chip Card with bare FEI4
  
 ====== Available equipment at TestBeam area ====== ====== Available equipment at TestBeam area ======
Line 111: Line 108:
 There is a working proteus distro at : There is a working proteus distro at :
 /afs/cern.ch/user/d/dfrizzel/proteus/ /afs/cern.ch/user/d/dfrizzel/proteus/
 +
 +Analysis code with Fermilab beam configuration can be found at:
 +/afs/cern.ch/user/d/dfrizzel/pixelAnalysis/analysis
 +
 +Preliminary results of this code can be found at : 
 +**/afs/cern.ch/work/d/dfrizzel/public/pixelAnalysis/output**
  
 Can also be obtained from gitlab instructions found at : Can also be obtained from gitlab instructions found at :
Line 176: Line 179:
 svn co svn+ssh://svn.cern.ch/reps/atlasinst/Institutes/ANL/ITK/note_testbeam2017feb/trunk note_testbeam2017feb svn co svn+ssh://svn.cern.ch/reps/atlasinst/Institutes/ANL/ITK/note_testbeam2017feb/trunk note_testbeam2017feb
 </code> </code>
 +
 +The current setup (March 24, 2017) looks as this:
 +
 +{{:itk:img_20170324_103513.jpg?200|}}
 +{{:itk:img_20170324_103309.jpg?200|}}
 +{{:itk:img_20170324_103046.jpg?200|}}
 +{{:itk:img_20170324_103042.jpg?200|}}
  
 ==== Calibration section ==== ==== Calibration section ====
 +
  
 Requires the flowing figures in the EPS format plus ROOT files. Please attach these ROOT files to this wiki. Requires the flowing figures in the EPS format plus ROOT files. Please attach these ROOT files to this wiki.
itk/testbeam_febmi2017.txt · Last modified: 2017/04/06 15:21 by asc