This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
itk:testbeam_febmi2017 [2017/04/03 20:42] dfrizzell [Location] |
itk:testbeam_febmi2017 [2017/04/06 02:16] dfrizzell [Current Status] |
||
---|---|---|---|
Line 11: | Line 11: | ||
https:// | https:// | ||
====== Current Status ====== | ====== Current Status ====== | ||
- | Updated Last: Mar 27 10:40 | + | Updated Last: Apr 4 |
- | No Beam, Pump down until 13:00. | + | |
+ | Taking data. We have cooling system " | ||
====== Argonne Equipment at FTBF Inventory List ====== | ====== Argonne Equipment at FTBF Inventory List ====== | ||
Line 108: | Line 109: | ||
/ | / | ||
- | Preliminary | + | Analysis code with Fermilab beam configuration can be found at: |
+ | / | ||
+ | |||
+ | Preliminary results of this code can be found at : | ||
**/ | **/ | ||