Line 1: | Line 1: | ||
+ | ====== LVPS Trip monitoring in 2018 ====== | ||
+ | < | ||
+ | |||
+ | ====== LVPS Trip monitoring in 2017 ====== | ||
+ | < | ||
+ | |||
+ | ====== LVPS Trip monitoring in 2016 ====== | ||
+ | |||
+ | < | ||
====== LVPS Trip monitoring in 2015 ====== | ====== LVPS Trip monitoring in 2015 ====== | ||
+ | Current trip status is given on [[https:// | ||
| Module | Trip time | Symptom, problem found | DCS image | | | Module | Trip time | Symptom, problem found | DCS image | | ||
- | | EBC62 | 2015-04-22 11:18:28 | NOT a real trip, EBC62 was power-cycled requested by DCS to fix timing jump (power-cycled https:// | + | |EBC10| 2015.07.05 06:19.16 | trip? https:// |
+ | |EBC22|2015-06-12 10: | ||
+ | |LBA43|2015-05-12 16: | ||
+ | |LBA47|2015-04-29 09: | ||
+ | |LBA37|2015-04-28 13: | ||
+ | |LBC12|2015-04-28 13: | ||
+ | |LBA07|2015-04-28 13: | ||
+ | |EBA19|2015-04-28 13: | ||
+ | |LBC24|2015-04-28 13: | ||
+ | |EBC62| 2015-04-22 11:18:28 | NOT a real trip, EBC62 was power-cycled requested by DCS to fix timing jump (power-cycled https:// | ||
+ | |LBC18|2015-04-22 11: | ||
+ | |EBA08|2015-04-17 22: | ||
|EBA02|2015-04-16 15: | |EBA02|2015-04-16 15: | ||
- | | EBC26 | 2015-04-04 15:10:21| REAL trip https:// | + | |<fc #FF0000>EBC26</fc>| 2015-04-04 15:10:21| REAL trip https:// |
- | |LBC03| 2015-04-09 06:07:10 | Probably | + | |LBC03| 2015-04-09 06:07:10 | NOT a real trip, power cycles requested by DAQ FSM | |
|LBC31| 2015-04-03 10:01:31 | NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off at ~0:00 on April 3, 2015 https:// | |LBC31| 2015-04-03 10:01:31 | NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off at ~0:00 on April 3, 2015 https:// | ||
|LBC31| 2015-04-03 02:00:00 | NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off on ~0:00 on April 3, 2015 https:// | |LBC31| 2015-04-03 02:00:00 | NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off on ~0:00 on April 3, 2015 https:// | ||
|LBC31| 2015-04-02 21:01:49 | NOT a real trip, power-cycled to fix 100% discarding events https:// | |LBC31| 2015-04-02 21:01:49 | NOT a real trip, power-cycled to fix 100% discarding events https:// | ||
- | |LBC31| 12:18:09 | Not sure it is real trip, but LBC31 experienced multiple auto power cycle during 2014-04-02 until it turned off https:// | + | |LBC31|2015-04-02 |
| LBC31 | 2015-04-02 00:59:29 | NOT a real trip, power-cycled to fix 99% discarding events https:// | | LBC31 | 2015-04-02 00:59:29 | NOT a real trip, power-cycled to fix 99% discarding events https:// | ||
- | | EBA11 | 2015-03-31 23:35:39 |Power cycled https:// | + | | EBA11 | 2015-03-31 23:35:39 |NOT a real trip, power cycled https:// |
- | | LBC11 | 2015-03-31 10:22:27 |Seem to be power cycled after this "LBC11 seems to be off (at least the ROD link is off). [Run #259427 LB #51]" https:// | + | | LBC11 | 2015-03-31 10:22:27 |NOT a real trip, power cycles requested by DAQ FSM| | |
- | | EBC10 | 2015-03-25 11:57:07 |real trip https:// | + | | <fc #FF0000>EBC10</ |
- | | EBC25 | 2015-03-25 01: | + | | EBC25 | 2015-03-25 01:45:56 |NOT a real trip. Power-cycled due to lost CAN-bus communication https:// |
- | | EBC26 | 2015-03-19 08:08:17 |Real trip https:// | + | | <fc #FF0000>EBC26</ |
- | | EBC10 | 2015-03-13 23:18:49 | real trip https:// | + | | <fc #FF0000>EBC10</ |
- | | LBC20 | 2015-03-11 10:14:45 | | | | + | | LBC20 | 2015-03-11 10:14:45 |NOT a real trip. HV_Micro reset ( by LVforHV PWR cycle) to fix HV on PMT42 https:// |
- | | EBC56 | 2015-03-10 13:23:45 | | | | + | | EBC56 | 2015-03-10 13:23:45 |NOT a real trip. EBC56 was power cycled due to "No communication" |
- | | LBA47 | 2015-03-09 16:00:02 | | | | + | | LBA47 | 2015-03-09 16:00:02 |NOT a real trip. Performed several tests for debugging the synchronization problem. The module was switched on and off during test. https:// |
- | | LBA05 | 2015-03-06 12:56:09 |Not found elog for this trip but later on 3/15 this modules discarded events (67%) and was power recycled by that (https:// | + | | LBA05 | 2015-03-06 12:56:09 |NOT a real trip. Performed MinBias test and module |
tilecal/lvpstripmonitoring.txt · Last modified: 2022/01/31 13:59 by asc