- | (prepared | + | (some notes by S.Chekanov) |
Here are the useful links on test beam in Sep. 2016 at SLAC. The plan is discuses | Here are the useful links on test beam in Sep. 2016 at SLAC. The plan is discuses | ||
- | What is used: 11 GeV secondary electrons (~100 - 200 per bunch), 5 HZ frequency. Original electron beam is 14 GeV. | + | What is used: 11 GeV secondary electrons (~10-100 |
+ | The beam sport is about 1x1 cm (tunable). | ||
+ | Original electron beam is 14 GeV. | ||
The setup is described in [[https:// | The setup is described in [[https:// | ||
To start the run, use: | To start the run, use: | ||
Line 19: | Line 21: | ||
Details on 2 tests: | Details on 2 tests: | ||
- | 1) Testing RTI (USA vendor) to test bum bonding. | + | 1) Testing RTI (USA vendor) to test bump bonding. |
Line 27: | Line 29: | ||
* Readout ASIC with 65 nm (vs 130 nm for FE-4IB). This decrease of ASIC leads to smaller sizes. | * Readout ASIC with 65 nm (vs 130 nm for FE-4IB). This decrease of ASIC leads to smaller sizes. | ||
+ | Here is the setup at the end-station A: | ||
- | ====== How to make calibration | + | This is the RTI module (uncovered): |
+ | |||
+ | {{: | ||
+ | |||
+ | This is the RTI module + RD53 prototype (uncovered): | ||
+ | |||
+ | {{: | ||
+ | |||
+ | Telescope: | ||
+ | |||
+ | {{: | ||
+ | |||
+ | Control room upstairs: | ||
+ | |||
+ | {{: | ||
+ | |||
+ | ====== How to calibrate the module | ||
Line 127: | Line 146: | ||
The plots you see above were done with the calibration done on Sep 29, 2016. | The plots you see above were done with the calibration done on Sep 29, 2016. | ||
The calibration taken on Sep. 30 (5AM) shows some changes. | The calibration taken on Sep. 30 (5AM) shows some changes. | ||
+ | |||
+ | ===== Plots without calibration===== | ||
Here are the plots without any calibration from Sep 30: | Here are the plots without any calibration from Sep 30: | ||
{{: | {{: | ||
+ | |||
+ | Note large number of low occupancy channels (40 counts instead 50). Right after installing this module, we had 99% of fully efficient channels.. | ||
{{: | {{: | ||
Line 140: | Line 163: | ||
It is clear that analog channels become inefficient during the time since Sep 29 when this module was installed. | It is clear that analog channels become inefficient during the time since Sep 29 when this module was installed. | ||
+ | ===== Plots after calibration===== | ||
After taking the full calibration with these files: | After taking the full calibration with these files: | ||
Line 150: | Line 174: | ||
<code bash> | <code bash> | ||
- | / | + | / |
</ | </ | ||
Line 171: | Line 195: | ||
- | Both modules from RTI has shown signs of degradation performance. After about the nigh (~6-8h), we start to see problems for the anlog part - less efficient number of pixels, and the noise significantly | + | Both modules from RTI have |
+ | |||
+ | This problem is not related to the active beam, since the red module was not under the beam on Sep 28. | ||
+ | |||
====== Information on scans ====== | ====== Information on scans ====== |
itk/testbeam.1475242280.txt.gz · Last modified: 2016/09/30 13:31 by asc