User Tools

Site Tools


itk:testbeam

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
itk:testbeam [2016/09/30 17:32]
asc [Conclusions:]
itk:testbeam [2016/10/04 15:11] (current)
asc
Line 1: Line 1:
  
 ======  Pixel module test beam at SLAC ====== ======  Pixel module test beam at SLAC ======
-(prepared by S.Chekanov)+(some notes by S.Chekanov)
  
  
Line 21: Line 21:
 Details on 2 tests: Details on 2 tests:
  
-1) Testing RTI (USA vendor) to test bum bonding.  We use  2 V for low voltage and max 0.5 A. We set -80 V as bias voltage for RTI (FE-I4B) board.+1) Testing RTI (USA vendor) to test bump bonding.  We use  2 V for low voltage and max 0.5 A. We set -80 V as bias voltage for RTI (FE-I4B) board.
  
  
Line 30: Line 30:
  
 Here is the setup at the end-station A: Here is the setup at the end-station A:
 +
 +This is the  RTI module (uncovered):
  
 {{:itk:img_20160928_103349.jpg?400|Setup}} {{:itk:img_20160928_103349.jpg?400|Setup}}
 +
 +This is the  RTI module + RD53 prototype (uncovered):
  
 {{:itk:img_20160928_100735.jpg?400|Setup}} {{:itk:img_20160928_100735.jpg?400|Setup}}
itk/testbeam.1475256741.txt.gz · Last modified: 2016/09/30 17:32 by asc