LVPS Trip monitoring in 2017

All manual interventions were taken from Operation elog

LVPS Trip monitoring in 2016

All manual interventions were taken from Operation elog

LVPS Trip monitoring in 2015

Current trip status is given on trip monitoring chart. All manual interventions are removed based on the table shown below.

Module Trip time Symptom, problem found DCS image
EBC10 2015.07.05 06:19.16 trip? https://atlasop.cern.ch/elisa/display/267540
EBC222015-06-12 10:36:28NOT a real trip. Automatic Power Cycle on EBC22, asked by DAQ System https://atlasop.cern.ch/elisa/display/264611
LBA432015-05-12 16:54:12NOT a real trip. Intervention was necessary to reboot the server which handles the ELMB monitoring - the detector was all the time ON (Filipe e-mail)
LBA472015-04-29 09:56:12NOT a real trip. Did TileMB test which turned off and then turned on the module https://atlasop.cern.ch/elisa/display/259446
LBA372015-04-28 13:33:51NOT a real trip. Power-cycled to verify deskew adjustment https://atlasop.cern.ch/elisa/display/259331
LBC122015-04-28 13:31:01NOT a real trip. Power-cycled to verify deskew adjustment https://atlasop.cern.ch/elisa/display/259331
LBA072015-04-28 13:30:11NOT a real trip. Power-cycled to verify deskew adjustment https://atlasop.cern.ch/elisa/display/259331
EBA192015-04-28 13:22:03NOT a real trip. Power-cycled to verify deskew adjustment https://atlasop.cern.ch/elisa/display/259331
LBC242015-04-28 13:16:51NOT a real trip. Power-cycled to verify deskew adjustment https://atlasop.cern.ch/elisa/display/259331
EBC62 2015-04-22 11:18:28 NOT a real trip, EBC62 was power-cycled requested by DCS to fix timing jump (power-cycled https://atlasop.cern.ch/elisa/display/258617 ; timing jump https://atlasop.cern.ch/elisa/display/258618)
LBC182015-04-22 11:19:31NOT a real trip. Power-cycled https://atlasop.cern.ch/elisa/display/258618
EBA082015-04-17 22:47:27Not a real trip, HV_830 tripped, restarted HV side https://atlasop.cern.ch/elisa/display/258168
EBA022015-04-16 15:19:54NOT a real trip, power-cycled to fix discarding events https://atlasop.cern.ch/elisa/display/257996
<fc #FF0000>EBC26</fc> 2015-04-04 15:10:21 REAL trip https://atlasop.cern.ch/elisa/display/256790
LBC03 2015-04-09 06:07:10 NOT a real trip, power cycles requested by DAQ FSM
LBC31 2015-04-03 10:01:31 NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off at ~0:00 on April 3, 2015 https://atlasop.cern.ch/elisa/display/256633 and was switched on again ~13:00 on April 3, 2015 https://atlasop.cern.ch/elisa/display/256669. The problem was fixed by using 2nd readout fiber https://atlasop.cern.ch/elisa/display/256668
LBC31 2015-04-03 02:00:00 NOT a real trip, the module was due to discarding events and auto power-cycled many time. It was off on ~0:00 on April 3, 2015 https://atlasop.cern.ch/elisa/display/256633 and was switched on again ~13:00 on April 3, 2015 https://atlasop.cern.ch/elisa/display/256669. The problem was fixed by using 2nd readout fiber https://atlasop.cern.ch/elisa/display/256668
LBC31 2015-04-02 21:01:49 NOT a real trip, power-cycled to fix 100% discarding events https://atlasop.cern.ch/elisa/display/256626. It was switched off ~0:00 on April 03, 2015 https://atlasop.cern.ch/elisa/display/256633
LBC312015-04-02 12:18:09 NOT a real trip, LBC31 experienced multiple auto power cycle during 2014-04-02 until it turned off https://atlasop.cern.ch/elisa/display/256633
LBC31 2015-04-02 00:59:29 NOT a real trip, power-cycled to fix 99% discarding events https://atlasop.cern.ch/elisa/display/256502
EBA11 2015-03-31 23:35:39 NOT a real trip, power cycled https://atlasop.cern.ch/elisa/display/256382
LBC11 2015-03-31 10:22:27 NOT a real trip, power cycles requested by DAQ FSM
<fc #FF0000>EBC10</fc> 2015-03-25 11:57:07 REAL trip https://atlasop.cern.ch/elisa/display/255607
EBC25 2015-03-25 01:45:56 NOT a real trip. Power-cycled due to lost CAN-bus communication https://atlasop.cern.ch/elisa/display/255559
<fc #FF0000>EBC26</fc> 2015-03-19 08:08:17 REAL trip https://atlasop.cern.ch/elisa/display/254713
<fc #FF0000>EBC10</fc> 2015-03-13 23:18:49 REAL trip https://atlasop.cern.ch/elisa/display/254196
LBC20 2015-03-11 10:14:45 NOT a real trip. HV_Micro reset ( by LVforHV PWR cycle) to fix HV on PMT42 https://atlasop.cern.ch/elisa/display/253653
EBC56 2015-03-10 13:23:45 NOT a real trip. EBC56 was power cycled due to “No communication” with HV-Micro inside drawer (issue also reported by the OPCUA server) https://atlasop.cern.ch/elisa/display/253516
LBA47 2015-03-09 16:00:02 NOT a real trip. Performed several tests for debugging the synchronization problem. The module was switched on and off during test. https://atlasop.cern.ch/elisa/display/253373
LBA05 2015-03-06 12:56:09 NOT a real trip. Performed MinBias test and module was power-cycled https://atlasop.cern.ch/elisa/display/252976

LVPS Trip monitoring in 2014

LVPS trip monitoring program: https://atlaswww.hep.anl.gov/asc/TileCal/EventReporterLVPS/

Module Trip time Last installation before trip, box number Symptom, problem found DCS image
EBC56 2014-01-16 21:50:26 tripped by -15V_HV, 5V_HV Vout = 0 at ~21:50 pm but Iout didn't change until ~10:40 pm ebc56_21h_jan16_2014.pdf
LBA53 2014-01-14 22:08:17 19-NOV-13, 543 lba53_22h_jan14_2014.pdf
Note: we have masked dead EBC42 since it is not accessible at this moment

Also look at Maintenance elog and Operation elog

History

Useful notes

  • Offline LVPS trip monitoring. Software implementation / Chekanov, S (ANL); Norberg, S (ANL/University of Oklahoma); Proudfoot, J (ANL) ATL-COM-TILECAL-2011-020.- Geneva : CERN, 2011 - 7 p.http://cdsweb.cern.ch/record/1228921?ln=en
  • Analysis of TileCal fLVPS Trip Characteristics / Chekanov, S (ANL); Norberg, S (ANL/University of Oklahoma); Proudfoot, J (ANL) ATL-COM-TILECAL-2011-019.- Geneva : CERN, 2011 - 11 p.ttp:cdsweb.cern.ch/record/1211303?ln=en Local copy: lvpsnote.pdf