Upgrade

Projects for the LHC phase II upgrade

  • Tile Calorimeter: QIE ASIC, HL Simulations, LV and HV power supplies (now concluded)
  • ITK: pixel module assembly and testing; pixel CO2 cooling tube design and fabrication
  • DAQ: FELIX readout system